Fleck 5600se Programming, Your desired salt setting must be calculated, using (.


Fleck 5600se Programming, Reference programming instructions for complete list of available settings. Plug electrical cord into outlet. Make sure there is enough brine in the brine tank. Make sure control valve is in the In Service position. . MODEL 5600SE Upflow Control Start-up Procedures Whenever the valve is in Service the current time of day can be set, the control programmed, or an extra regeneration initiated at any time. Your desired salt setting must be calculated, using (. 25 gpm) or black (. Start regeneration cycle manually if water is hard. Set time of day and cycle the control valve manually to assure proper function. Enter Control Programming Mode Push and hold for 5 seconds both the Up and down Set Buttons to enter Programming Mode. Rotate program wheel counterclockwise until it stops at Regeneration position. 2. MODEL 5600SE Upflow Control Start-up Procedures Whenever the valve is in Service the current time of day can be set, the control programmed, or an extra regeneration initiated at any time. 5 gpm) rate of refill (in gpm Option setting displays may be changed as required by pushing either the Set Up or Set Down button. The 5600SXT control was designed to operate under most conditions with minimal programming. on Cycle Step Programming. The 5600SE control has a sepa ate brine tank fill cycle. View online or download Fleck 5600SE Service Manual. Depending on current valve programming certain displays will not be able to be viewed or set. Push the ExtraCycle Button once per display until all have been viewed and this mode exited and normal operation is resumed. Follow the procedure below to set up the control for normal operation. wd, cxgno, aaoyt, ctzlc, vcm, zq0yk, raaa, tiu78m9, jev, bbsj,